How long does custom carpentry take in Singapore?
+
Lead time depends on scope. A standard built-in wardrobe or TV console typically takes 3–4 weeks from measurement to installation. A full kitchen cabinet set runs 4–6 weeks. We give you a realistic timeline upfront and keep you updated throughout — no surprises.
Do you work on HDB flats as well as condos?
+
Yes — we work on HDB flats, condos, landed homes, offices, clinics, retail shops, and commercial spaces across all of Singapore. Each space has different storage needs and layouts, and we customise accordingly.
What materials and finishes do you offer?
+
We carry a wide range of laminates, melamine boards, solid wood veneers, and lacquer finishes. At our workshop, you can view actual wood samples, laminate swatches, and hardware options before committing. We'll recommend what works best for your budget and usage.
Do you do full renovation or just carpentry?
+
AFIX is a general contractor — we handle full renovations including carpentry, electrical, plumbing, flooring, and painting under one team. If you only need carpentry, that's fine too. Having one contractor coordinate everything means fewer gaps, fewer delays, and one point of accountability.
How is AFIX different from other carpentry contractors?
+
We have an in-house carpenter workshop — work is done by our own team, not subcontracted out. We check details early (measurements, space usage, alignment) and solve problems at the root rather than patching over them. Before installation, we walk you through how each piece is customised for your specific space.
How do I get a carpentry quote?
+
WhatsApp us with your floor plan or a brief description of what you need. We'll arrange a site visit, take measurements, and come back with an itemised quote within 2 working days — no obligation, no pressure.